[openib-general] nightly osm_sim report 2006-12-22:normal completion
Eitan Zahavi
eitan at sw053.yok.mtl.com
Thu Dec 21 21:10:01 PST 2006
OSM Simulation Regression Summary
OpenSM rev = Thu_Dec_21_14:36:22_2006 c3fcbb MOD_FILES=1
ibutils rev = Mon_Dec_18_16:00:49_2006 11d857
Total=396 Pass=395 Fail=1
Pass:
54 Stability IS1-16.topo
54 Pkey IS1-16.topo
54 OsmStress IS1-16.topo
54 Multicast IS1-16.topo
54 LidMgr IS1-16.topo
18 Stability IS3-loop.topo
18 Stability IS3-128.topo
18 Pkey IS3-128.topo
18 OsmStress IS3-128.topo
18 Multicast IS3-loop.topo
18 Multicast IS3-128.topo
17 LidMgr IS3-128.topo
Failures:
1 LidMgr IS3-128.topo
More information about the general
mailing list