[openib-general] nightly osm_sim report 2006-12-28:normal completion
Eitan Zahavi
eitan at sw053.yok.mtl.com
Wed Dec 27 21:24:47 PST 2006
OSM Simulation Regression Summary
OpenSM rev = Wed_Dec_27_12:30:42_2006 61a6c6
ibutils rev = Wed_Dec_27_23:39:30_2006 60aebe
Total=374 Pass=374 Fail=0
Pass:
42 Stability IS1-16.topo
42 Pkey IS1-16.topo
42 OsmTest IS1-16.topo
42 Multicast IS1-16.topo
41 OsmStress IS1-16.topo
39 LidMgr IS1-16.topo
14 Stability IS3-loop.topo
14 Stability IS3-128.topo
14 Pkey IS3-128.topo
14 OsmTest IS3-loop.topo
14 OsmTest IS3-128.topo
14 OsmStress IS3-128.topo
14 Multicast IS3-loop.topo
14 Multicast IS3-128.topo
14 LidMgr IS3-128.topo
Failures:
More information about the general
mailing list