[ofa-general] OFED Nov 24, 2008 meeting minutes
Tziporet Koren
tziporet at mellanox.co.il
Mon Nov 24 13:15:32 PST 2008
OFED Nov 24, 2008 meeting minutes
===========================
Meeting Summary:
==============
* OFED 1.4 release: RC6 on Nov 28, GA on Dec 8
* UNH will test RC6 as part of Logo program (will start with RC5
this week)
* OFED documentation and training - Jim Ryan will raise in next
XWG meeting
Details:
=======
> 1. Bugs status review:
> 1370 blo vlad at mellanox.co.il Ping over IPoIB
> I/F fails after ifconfig down and up - there is a fix but its not
> integrated - Vlad to take it
> 1242 cri yannick.cote at qlogic.com kernel panic while
> running mpi2007 against ofed1.4 -- ib_... - should be delayed for
> 1.4.1 - move to normal
> 1410 cri vlad at mellanox.co.il Memory leak
> (address handler not reped) in IPoIB - we have a fix, need to decide
> 1289 maj jackm at mellanox.co.il Ib and ipoib doesn't
> respond while running multiple tests ... - should be fixed - ask
> Mellanox QA to check
> 1407 maj monis at voltaire.com Active-Backup failure
> when disabling an active slave inte... - fixed with new bonding
> package
> 1377 maj vu at mellanox.com Deadlock occurred during
> HA test - on work
> 1380 maj vu at mellanox.com Cannot unload ib_srpt
> module on SRP target - moved to normal (involves scst's mid-layer
> module which we don't have *a lot of* control)
> 1395 maj vu at mellanox.com kernel panic during SRP
> HA test - on work
> 1384 maj eli at mellanox.co.il netperf latency
> small messages increase 5% - not reproduced on SLES10 SP2 with FW
> 2.5.0
> 1385 maj eli at mellanox.co.il ofed 1.4 - netperf udp
> BW small messages decrease ~8%
> 1386 maj eli at mellanox.co.il ofed 1.4 - iperf tcp
> connected mode BW large messages dec...
>
mvapich2 - Going to update package + RN
> 2. Decided on release date:
* RC6 - 28 for Nov
* GA - Dec 8 after UNH testing for the logo program
> 3. Decided on next meetings dates:
> Dec 1, Dec 8 and Dec 15 (only if the release is not done)
>
4. Logo program and OFED release:
* We wish that UNH will test it on each RC, as each vendor does,
so we will not find surprises in the last RC.
* Rupert will see if they can start with RC5 this week.
* UNH will test RC6 next week
* Need to add Windows - Linux interop to the Logo program - Rupert
will lead the change to the test plan. Should be done in next interop
event.
5. Training and documentation:
* In OFA BOF there was a request for documentation and training
for using OFED.
* Jim Ryan will raise the subject of training/documents in the XWG
meeting, and see if OFA can finance it
* Options - some company in the bay area (I did not captured the
name) and UNH on east cost
* Olga to check with Voltaire if they have something to contribute
* Tziporet will check with Mellanox to see if we can contribute
our verbs user manual
> Tziporet
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.openfabrics.org/pipermail/general/attachments/20081124/6109554e/attachment.html>
More information about the general
mailing list