OFED meeting summary for July 14, 2008 on 1.4 features completeness
status
========================================================================
==
Summary:
========
- Most of components are ready for the feature freeze of OFED 1.4
- We should have alpha release next week.
Details:
========
OFED 1.4 feature readiness for the freeze:
- Kernel base 2.6.27 (start with 2.6.26) - 2.6.26 done, will move to
2.6.27 when rc1 available
- Multi-Protocol support, Eth and IB for ConnectX - all patches
submitted, to be merged this week
- NFS-RDMA - kernel 2.6.26 done. Distros backports not ready yet.
Will start with SLES10 and then RHEL5.1
- iSer Target - on work; merge should start this week
- New iWARP verbs (fast memory thru send queue, local invalidate
send
work requests, Read with invalidate) - done in 2.6.27, will need
backports when we move
- IPoIB (LRO and RSS) - LRO - in 2.6.27, RSS - patches to be sent
this week
- RDS iWARP support - In progress. Still need to debug fastreg
usage, but first merge has been done into Olaf's tree.
- SDP (GA) - patches were sent, merged to OFED tree
- Raw QP support with ConnectX - under testing
- uDAPL - socket cm for scalability - done. UD extensions will be
done end of week.
- OpenSM - code freeze of openSM can be later since it's a closed
user level apps.
- ibnetdiscover library - accelerate other tools.
- Congestion Control - code in ibutils done; under testing
- MVAPICH 1.1 - Should have tarball by end of the month
- MVAPICH2 1.2 - Should have tarball by end of the month
- OpenMPI 1.3 - do not yet have beta tarballs for OMPI v1.3. Might
be able to get some for the OFED v1.4
- Backports status:
- ipath driver - RHEL5, SLES10 and all kernels below 2.6.18 -
Qlogic - to be completed by end of the week
- NFSoRDMA - we need at least RHEL5 and SLES 10 - Jeff Backer -
on work
- EHCA: SLES10/SP1/SP2 - IBM - done
Other topics:
* Woody raised the question of Dev-Con at SC08.
Conclusion was that we do not see a need for a special event, but a
meeting for one or two hours of all
developers that will come to SC08 is a good idea.
* New server setup:
Jeff updated us that the new server arrived.
The request is to move to the new server in 1-2 weeks.
Meetings minutes on the web:
http://www.openfabrics.org/txt/documentation/linux/EWG_meeting_minutes/
Tziporet
More information about the ewg
mailing list